Abstract:In this paper, combined with the characteristics of aerospace ceramic packaging chip and water vapor control requirements, the SiP ceramic packaging process has been studied. The factors of water vapor in the ceramic packaging process have been analyzed, the packaging production process has been optimized, the factory supervision during the pre drying and transfer process has been added, and the process control of the transfer time has been ensured. The effectiveness of the control measures has been verified through experiments.